Loading...

GEOTECHNICS & TUNNELS

PROJECTS

Consultancy services for Detailed Design Consultancy, 3D monitoring and Construction Supervision for Tunneling and Underground jobs – (TBM-NATM method).s.

Some Important Projects:
Independent Engineer for Construction of 8.8 km Highway Tunnel across Rohtang Pass, Manali, Himachal Pradesh.
Detailed Design consultancy, 3D monitoring and Construction Supervision of tunnels in with Construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project (Total tunnel length: 10.74 km).
Detailed Design Consultancy, 3D monitoring and Construction Supervision of Tunnel of Katra to Dharam section of Udhampur-Srinagar-Baramulla New BG Railway Project. (Length: 16.098 km).
People Power:
  • Team Leaders /Project Managers
  • Tunnel Design Engineers
  • Ventilation Engineers
  • Structural Engineers
  • 3D Monitoring cum Survey Engineers
  • Geologist
  • Geo Technical Engineers
  • Environmental Specialists
  • Procurement / Contract Experts
  • Construction Planning Engineers
  • Estimators
  • Quality Control Engineers
  • Material Engineers
  • Laboratory Engineers
  • Field Inspectors
  • Surveyors

CREATING PROGRESS

from Vision to Reality