Loading...

GEOTECHNICS & TUNNELS

PROJECTS

Consultancy services for Detailed Design Consultancy, 3D monitoring and Construction Supervision for Tunneling and Underground jobs – (TBM-NATM method).s.

Some Important Projects:
tn-01
Independent Engineer for Construction of 8.8 km Highway Tunnel across Rohtang Pass, Manali, Himachal Pradesh.
tn-02
Detailed Design consultancy, 3D monitoring and Construction Supervision of tunnels in with Construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project (Total tunnel length: 10.74 km).
tn-03
Detailed Design Consultancy, 3D monitoring and Construction Supervision of Tunnel of Katra to Dharam section of Udhampur-Srinagar-Baramulla New BG Railway Project. (Length: 16.098 km).
OUR STRENGTHS:
  • Team Leaders /Project Managers
  • Tunnel Design Engineers
  • Ventilation Engineers
  • Structural Engineers
  • 3D Monitoring cum Survey Engineers
  • Geologist
  • Geo Technical Engineers
  • Environmental Specialists
  • Procurement / Contract Experts
  • Construction Planning Engineers
  • Estimators
  • Quality Control Engineers
  • Material Engineers
  • Laboratory Engineers
  • Field Inspectors
  • Surveyors

CREATING PROGRESS

from Vision to Reality